Optimization of construction schedules with the assumed multi-tasking
of working brigades

Data publikacji: 25.08.2017

Czasopismo Techniczne, 2017, Volume 8 Year 2017 (114), s. 109 - 118

https://doi.org/10.4467/2353737XCT.17.133.6884

Autorzy

Michał Krzemiński
The Division of Production Engineering and Construction Management, Institute of Building Engineering, Faculty of Civil Engineering, Warsaw University of Technology
Wszystkie publikacje autora →

Tytuły

Optimization of construction schedules with the assumed multi-tasking
of working brigades

Abstrakt

The paper presents a newly developed model aimed at minimizing the downtime in working brigades work. The developed method is dedicated to the construction planned using the stream method of work
organization. The model focuses on the assumption of multi-tasking of working brigades. It has been possible to model the performance depending on the type of brigade and the type of work being performed. The article also shows an example illustrating the results of the model’s operation.

Bibliografia

[1] Biruk S., Jaśkowski P., Scheduling construction of multi-object projects: problem of works continuity in consecutive units, Zeszyty Naukowe WSOWL, 3 (157), 2010, 340–349.
[2] Hejducki Z., Scheduling Model of Construction Activity with Time Couplings, Journal of Civil Engineering and Management, 9:4, 2003, 284–291.
[3] Krzemiński M., Use of the KASS Program in Scheduling, Technical Transaction, 2-B(6), 2014, 217–224.
[4] Marcinkowski R., Metody rozdziału zasobów realizatora w działalności inżynieryjno - budowlanej, WAT, Warszawa 2002.
[5] Pinedo M.L., Scheduling: Theory, Algorithms, and Systems, Springer, 2012.
[6] Rogalska M., Bożejko W., Hejducki Z., Time/Cost Optimization Using Hybrid Evolutionary Algorithm in Construction Project Scheduling, Automotion in Construction, 18, 2008, 24–31.

Informacje

Informacje: Czasopismo Techniczne, 2017, Volume 8 Year 2017 (114), s. 109 - 118

Typ artykułu: Oryginalny artykuł naukowy

Tytuły:

Polski:

Optimization of construction schedules with the assumed multi-tasking
of working brigades

Angielski:

Optimization of construction schedules with the assumed multi-tasking
of working brigades

Autorzy

The Division of Production Engineering and Construction Management, Institute of Building Engineering, Faculty of Civil Engineering, Warsaw University of Technology

Publikacja: 25.08.2017

Status artykułu: Otwarte __T_UNLOCK

Licencja: Żadna

Udział procentowy autorów:

Michał Krzemiński (Autor) - 100%

Korekty artykułu:

-

Języki publikacji:

Angielski