TY - JOUR TI - Optimization of construction schedules with the assumed multi-tasking of working brigades AU - Krzemiński, Michał TI - Optimization of construction schedules with the assumed multi-tasking of working brigades AB - The paper presents a newly developed model aimed at minimizing the downtime in working brigades work. The developed method is dedicated to the construction planned using the stream method of work organization. The model focuses on the assumption of multi-tasking of working brigades. It has been possible to model the performance depending on the type of brigade and the type of work being performed. The article also shows an example illustrating the results of the model’s operation. VL - 2017 IS - Volume 8 Year 2017 (114) PY - 2017 SN - 0011-4561 C1 - 2353-737X SP - 109 EP - 118 DO - 10.4467/2353737XCT.17.133.6884 UR - https://ejournals.eu/czasopismo/czasopismo-techniczne/artykul/optimization-of-construction-schedules-with-the-assumed-multi-tasking-of-working-brigades KW - flowshop models KW - slack minimization KW - construction schedules