Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor
cytuj
pobierz pliki
RIS BIB ENDNOTEWybierz format
RIS BIB ENDNOTE
Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor
Data publikacji: 25.08.2017
Czasopismo Techniczne, 2017, Volume 8 Year 2017 (114), s. 73 - 79
https://doi.org/10.4467/2353737XCT.17.130.6881Autorzy
Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor
Random events may interfere with the execution process and results of the work. Then, the duration and cost of work are random variables. The random characteristics of these variables are described by using the β-PERT probability distribution and the simplified formulas. To determine the probable changes of the duration and cost of work, depending on the random factors, the coefficients of optimism and pessimism have been used. Additionally, the coefficients of improvement and deterioration of conditions of work implementation have been introduced. The values of these coefficients are calculated depending on the type, the probability of occurrence, the intensity of random perturbations and depending on the probable changes of the work duration as well as the probability and cost consequences of the price increase. Extreme random improvement and deterioration of the work execution conditions are analysed.
[1] Kasprowicz T., Analiza ryzyka przedsięwzięć budowlanych, Zeszyty Naukowe Politechniki Rzeszowskiej, seria Budownictwo i Inżynieria Środowiska Z.58 (3/11/III), Rzeszów 2011, 233–240.
[2] Kasprowicz T., Inżynieria przedsięwzięć budowlanych, [w:] Metody i modele w inżynierii przedsięwzięć budowlanych, red. naukowy Oleg Kapliński, Wyd. PAN KILiW, IPPT, 2007, 35–78.
[3] Skorupka D., Method of Construction Projects Risk Assessment, LAMBERT Academic Publishing GmbH & Licensors, Saarbrücken 2012.
[4] Skorupka D., Identification and initial risk assessment of construction projects in Poland, Journal of Management in Engineering, 2008, 120–127.
[5] Turskis Z., Gajzler M., Dziadosz A., Reliability, Risk Management, and Contingency of Construction Processes and Projects, Journal of Civil Engineering and Management, ISSN 1392-3730 print/ISSN 1822-3605 online, 2012 Volume 18(2): 290–298.
Informacje: Czasopismo Techniczne, 2017, Volume 8 Year 2017 (114), s. 73 - 79
Typ artykułu: Oryginalny artykuł naukowy
Tytuły:
Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor
Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor
Faculty of Civil Engineering and Geodesy, Military University of Technology
Publikacja: 25.08.2017
Status artykułu: Otwarte
Licencja: Żadna
Udział procentowy autorów:
Korekty artykułu:
-Języki publikacji:
AngielskiLiczba wyświetleń: 1592
Liczba pobrań: 914