Case study of modified stay cable’s anchorage ‒ laboratory tests
cytuj
pobierz pliki
RIS BIB ENDNOTEWybierz format
RIS BIB ENDNOTECase study of modified stay cable’s anchorage ‒ laboratory tests
Data publikacji: 2012
Czasopismo Techniczne, 2012, Budownictwo Zeszyt 4-B (21) 2012, s. 1-1
https://doi.org/10.4467/2353737XCT.14.081.1858Autorzy
Case study of modified stay cable’s anchorage ‒ laboratory tests
The paper shows the case study of modified stay cable’s anchorage in concrete base. The idea of modification is the introduction of additional rings on the formwork tube to improve the composite action between steel and concrete. Comparison between tested anchorage and typical element used in commercial systems is discussed. Composite force between steel and concrete in stay cable’s anchorage is presented. Influence of introduced ring on load capacity and behavior of entire anchorage is discussed.
Informacje: Czasopismo Techniczne, 2012, Budownictwo Zeszyt 4-B (21) 2012, s. 1-1
Typ artykułu: Oryginalny artykuł naukowy
Tytuły:
Case study of modified stay cable’s anchorage ‒ laboratory tests
Case study of modified stay cable’s anchorage ‒ laboratory tests
Instytut Kulturoznawstwa, Uniwersytet im. Adama Mickiewicza w Poznaniu, ul. Szamarzewskiego 89A, 60-568 Poznań
Katedra Mechaniki Budowli i Mostów, Wydział Inżynierii Lądowej i Środowiska, Politechnika Gdańska
Publikacja: 2012
Status artykułu: Otwarte
Licencja: Żadna
Udział procentowy autorów:
Korekty artykułu:
-Języki publikacji:
PolskiLiczba wyświetleń: 2023
Liczba pobrań: 1600