Energy-saving and ecological solutions applied in modern German office buildings
cytuj
pobierz pliki
RIS BIB ENDNOTEWybierz format
RIS BIB ENDNOTEEnergy-saving and ecological solutions applied in modern German office buildings
Data publikacji: 02.02.2016
Czasopismo Techniczne, 2015, Architektura Zeszyt 3-A (3) 2015, s. 161 - 177
https://doi.org/10.4467/2353737XCT.15.072.3872Autorzy
Energy-saving and ecological solutions applied in modern German office buildings
In the following article, there are introduced some modern, environmental friendly technologies, that are being adapted in new-build and modernized office buildings in Germany. Various solutions are presented: referring to structure and construction, such as double and triple, ventilated curtain walls, cooling slabs and advanced installation systems converting sun, wind and water energy into electric current and heating power. Beside, functional schemes of several office buildings are being analyzed. Author studies the effect of these solutions on work environment and ergonomics. Moreover, there are discussed architectural design issues in the context of multi-criteria evaluation of buildings. (BREEAM, LEED, DGNB). The main part of the article, that refers to German office buildings is completed with descriptions of buildings located in Vienna.
[1] ADAC. Die neue ADAC Zentrale. Allgemeiner Deutscher Automobil-Club e.V., München 2012.
[2] Grüne Bilanzen. Neue Deutsche Bank Türme, Frankfurt a.M., „DBZ Deutche Bauzeitschrift” 9/2011m (59), Bertelsmann Fach-Ztschr., Gutersloh 2011.
[3] Kappelt H., Klimaschutz-Musterbau. Passivebürohochhaus RHW 2, Wien, „IndustrieBAU” 5/2013, Vincentz Verl., Hannover 2013.
[4] Käpplinger C., Bürohaus DGNB Gold vorzertifiert. F40-Geschäftshaus, Berlin, „DBZ Deutche Bauzeitschrift” 6/2013 (61), Bertelsmann Fach-Ztschr., Gutersloh 2013.
[5] Meinig M., Neues Landmark für den Münchener Westen. ADAC_Zentrale, München, „IndustrieBAU” 5/2011, Vincentz Verl., Hannover 2011.
[6] Meyerhöfer D., Das unmögliche Bankhaus. Bankverwaltung Volksbank AG, Wien/A, „DBZ Deutche Bauzeitschrift” 9/2011 (59), Bertelsmann Fach-Ztschr., Gutersloh 2011.
[7] Pisarev V., Czarniecki D., System klimatyzacji centralnej ze stropami chłodzącymi i gruntowym wymiennikiem ciepła, „Czasopismo Inżynierii Lądowej, Środowiska i Architektury” 2013, nr 4 (60), Oficyna Wydawnicza Politechniki Rzeszowskiej, Rzeszów 2013.
[8] RHW.2. Zubau zum Raiffeisen, Wien 2012.
[9] U.S. Green Building Rating System, LEED 2009 for new construction and major renovations.
[10] www.breeam.org/BREEAM2011SchemeDocument (access: 8.11.2014).
Informacje: Czasopismo Techniczne, 2015, Architektura Zeszyt 3-A (3) 2015, s. 161 - 177
Typ artykułu: Oryginalny artykuł naukowy
Tytuły:
Energy-saving and ecological solutions applied in modern German office buildings
Energy-saving and ecological solutions applied in modern German office buildings
Institute of Architectural Design, Faculty of Architecture, Cracow University of Technology; Committee on Ergonomics, Polish Academy of Sciences
Publikacja: 02.02.2016
Status artykułu: Otwarte
Licencja: Żadna
Udział procentowy autorów:
Korekty artykułu:
-Języki publikacji:
AngielskiLiczba wyświetleń: 1743
Liczba pobrań: 1241