Project Risk Management of Electrical Switchboard Delivery
cytuj
pobierz pliki
RIS BIB ENDNOTEChoose format
RIS BIB ENDNOTEProject Risk Management of Electrical Switchboard Delivery
Publication date: 07.07.2016
International Journal of Contemporary Management, 2016, Issue 15(2), pp. 85 - 103
https://doi.org/10.4467/24498939IJCM.16.012.5552Authors
Background. In projects of electrical switchboard delivery we can identify many risks which are usually quite severe in their consequences, because these projects are high-budget projects. Our studies indicate that there are no formalised risk management procedures in many Polish companies that realise such projects.
Research aims. Therefore we propose using a traditional risk management procedure adapted for projects of electrical switchboard delivery what was verified on the example of a selected company.
Methodology. We use the following research methods: analysis of the documentation relating to completed projects of electrical switchboard delivery, interviews with project managers, and literature studies.
Key findings. We obtained the following results: Work Breakdown Structure (WBS), list of identified project risks, list of risk responses, computer tool for managing identified risks in projects of electrical switchboard delivery. Based on the completed studies we can state that risk management is an important element of electrical switchboard delivery and should not be ignored in companies that realise such projects.
Brown, E.M. & Chong, Y.Y. (2000). Managing Project Risk. London: Person Education Limited.
Courtot, H. (1998). La gestion des risques dans les projets. Paris: Ed. Economica.
Davidson, F.J. (1995). Managing Projects In Organizations. How to Make the Best Use of a Time, Techniques and People? San Francisco: Jossey-Bass Publishers.
Forsbery, K., Mooz, H. & Cotterman, H. (1996). Visualizing Project Management. New York: John Willley & Sons.
Kaczmarek, T. (2006). Ryzyko i zarządzanie ryzykiem. Ujęcie interdyscyplinarne. Warszawa: Centrum Doradztwa i Informacji Difin.
Kaen, F.R. (2000). Risk Management: A Corporate Governance Perspective in Risk, Challenge and Opportunity. Berlin: Springer.
Kleim, R.I. & Ludin, I.S. (1997). Reducing Project Risk. Aldershot: Gower.
Maylor, H. (1996). Project Management. London: Pitman Publishing.
Pfeffer, J. (1956). Insurance and Economic Theory. Homewood, Illinois: Irvin Inc.
Pritchard, C.L. (2012). Risk Management. Concepts and Guidance. Boca Raton: CRC Press.
PMI [Project Management Institute] (2008). A Guide to the Project Management Body of Knowledge. 4th Edition, Pennsylvania.
Project Management for Instructional Designers, http://pm4id.org/11/1/ (access: 30.07.2015).
Ptaszyńska, E. (2012). Metoda zarządzania ryzykiem projektów. PhD thesis, supervisor: prof. D. Kuchta. Wrocław.
Rogowski, W., Michalczewski, A. (2005). Zarządzanie ryzykiem w przedsięwzięciach inwestycyjnych. Kraków: Oficyna Ekonomiczna.
Trocki, M. & Grucza, B. (2007). Zarządzanie projektem europejskim. Warszawa: Polskie Wydawnictwo Ekonomiczne.
Samuelson, W.F. & Marks S.G. (2006). Managerial Economics. 5th Edition. New York: John Wiley & Sons.
Troelsen, A. (2012). Pro C# 5.0 and the .Net 4.5 Framework. 6th Edition. New York: Apress.
Willett, A.H. (1901). The Economic Theory of Risk and Insurant. Columbia University Studies.
Zachorowska, A. (2006) Ryzyko działalności inwestycyjnej przedsiębiorstw. Warszawa: PWE.
Information: International Journal of Contemporary Management, 2016, Issue 15(2), pp. 85 - 103
Article type: Original article
Titles:
Project Risk Management of Electrical Switchboard Delivery
Wrocław University of Technology, 27 Wybrzeże Wyspiańskiego St 50-370 Wrocław
Wroclaw University of Technology, Poland
Published at: 07.07.2016
Article status: Open
Licence: None
Percentage share of authors:
Article corrections:
-Publication languages:
EnglishView count: 1465
Number of downloads: 4421