Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor
Choose format
RIS BIB ENDNOTE
Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor
Publication date: 25.08.2017
Technical Transactions, 2017, Volume 8 Year 2017 (114), pp. 73-79
https://doi.org/10.4467/2353737XCT.17.130.6881Authors
Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor
Random events may interfere with the execution process and results of the work. Then, the duration and cost of work are random variables. The random characteristics of these variables are described by using the β-PERT probability distribution and the simplified formulas. To determine the probable changes of the duration and cost of work, depending on the random factors, the coefficients of optimism and pessimism have been used. Additionally, the coefficients of improvement and deterioration of conditions of work implementation have been introduced. The values of these coefficients are calculated depending on the type, the probability of occurrence, the intensity of random perturbations and depending on the probable changes of the work duration as well as the probability and cost consequences of the price increase. Extreme random improvement and deterioration of the work execution conditions are analysed.
[1] Kasprowicz T., Analiza ryzyka przedsięwzięć budowlanych, Zeszyty Naukowe Politechniki Rzeszowskiej, seria Budownictwo i Inżynieria Środowiska Z.58 (3/11/III), Rzeszów 2011, 233–240.
[2] Kasprowicz T., Inżynieria przedsięwzięć budowlanych, [w:] Metody i modele w inżynierii przedsięwzięć budowlanych, red. naukowy Oleg Kapliński, Wyd. PAN KILiW, IPPT, 2007, 35–78.
[3] Skorupka D., Method of Construction Projects Risk Assessment, LAMBERT Academic Publishing GmbH & Licensors, Saarbrücken 2012.
[4] Skorupka D., Identification and initial risk assessment of construction projects in Poland, Journal of Management in Engineering, 2008, 120–127.
[5] Turskis Z., Gajzler M., Dziadosz A., Reliability, Risk Management, and Contingency of Construction Processes and Projects, Journal of Civil Engineering and Management, ISSN 1392-3730 print/ISSN 1822-3605 online, 2012 Volume 18(2): 290–298.
Information: Technical Transactions, 2017, Volume 8 Year 2017 (114), pp. 73-79
Article type: Original article
Titles:
Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor
Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor
Faculty of Civil Engineering and Geodesy, Military University of Technology
Published at: 25.08.2017
Article status: Open
Licence: None
Percentage share of authors:
Article corrections:
-Publication languages:
EnglishView count: 1654
Number of downloads: 954