Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor

Publication date: 25.08.2017

Technical Transactions, 2017, Volume 8 Year 2017 (114), pp. 73-79

https://doi.org/10.4467/2353737XCT.17.130.6881

Authors

Tadeusz Kasprowicz
Faculty of Civil Engineering and Geodesy, Military University of Technology
All publications →

Download full text

Titles

Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor

Abstract

Random events may interfere with the execution process and results of the work. Then, the duration and cost of work are random variables. The random characteristics of these variables are described by using the β-PERT probability distribution and the simplified formulas. To determine the probable changes of the duration and cost of work, depending on the random factors, the coefficients of optimism and pessimism have been used. Additionally, the coefficients of improvement and deterioration of conditions of work implementation have been introduced. The values of these coefficients are calculated depending on the type, the probability of occurrence, the intensity of random perturbations and depending on the probable changes of the work duration as well as the probability and cost consequences of the price increase. Extreme random improvement and deterioration of the work execution conditions are analysed.

References

[1] Kasprowicz T., Analiza ryzyka przedsięwzięć budowlanych, Zeszyty Naukowe Politechniki Rzeszowskiej, seria Budownictwo i Inżynieria Środowiska Z.58 (3/11/III), Rzeszów 2011, 233–240.
[2] Kasprowicz T., Inżynieria przedsięwzięć budowlanych, [w:] Metody i modele w inżynierii przedsięwzięć budowlanych, red. naukowy Oleg Kapliński, Wyd. PAN KILiW, IPPT, 2007, 35–78.
[3] Skorupka D., Method of Construction Projects Risk Assessment, LAMBERT Academic Publishing GmbH & Licensors, Saarbrücken 2012.
[4] Skorupka D., Identification and initial risk assessment of construction projects in Poland, Journal of Management in Engineering, 2008, 120–127.
[5] Turskis Z., Gajzler M., Dziadosz A., Reliability, Risk Management, and Contingency of Construction Processes and Projects, Journal of Civil Engineering and Management, ISSN 1392-3730 print/ISSN 1822-3605 online, 2012 Volume 18(2): 290–298.

Information

Information: Technical Transactions, 2017, Volume 8 Year 2017 (114), pp. 73-79

Article type: Original article

Titles:

Polish:

Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor

English:

Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor

Authors

Faculty of Civil Engineering and Geodesy, Military University of Technology

Published at: 25.08.2017

Article status: Open

Licence: None

Percentage share of authors:

Tadeusz Kasprowicz (Author) - 100%

Article corrections:

-

Publication languages:

English

Quantitative estimation of the impact of random confounding factors on the duration
and cost of construction wor