FAQ

Modelling of network schedule including priority of selected technical resources

Publication date: 16.06.2014

Technical Transactions, 2014, Civil Engineering Issue 2-B (6) 2014, pp. 185-192

https://doi.org/10.4467/2353737XCT.14.126.2576

Authors

Anna Jakubczyk-Gałczyńska
Department of Metal Structures and Management in CE, Faculty of Civil and Environmental Engineering, Gdansk University of Technology
All publications →

Download full text

Titles

Modelling of network schedule including priority of selected technical resources

Abstract

The paper presents a method of network planning CPM – Critical Path Method. The author compares models of optimal solutions to design deadlines for individual works, taking various leading technical resources such as is labor and a tower crane into account.

References

Kapliński O. i in., An attempt of management process standardization at the stage of planning and implementation of construction Project, 57th Annual Scientific Conference, Poland 2011.

Patan M., Programowanie sieciowe. Metoda ścieżki krytycznej [Network programming. Critical path method] (www.issi.uz.zgora.pl), Poland.

Jaworski K.M., Metodologia projektowania realizacji budowy (Design methodology of the construction), PWN, Warszawa 1999.

Tangible Directories Expenditures (Katalogi Nakładów Rzeczowych): KNR 2-01 Budowle i roboty ziemne (Buildings and earthworks), ORGBUD, wyd. 2, 1987–1996; KNR 2-02 Konstrukcje budowlane [Building Construction], ORGBUD. Wyd. specjalne, 1998.

Marcinkowski R., The optimization criteria for construction schedules, Inżynieria Morska i Geotechnika, Vol. 5, 2013, 373-376.

Sharma S.C., Operation Research: Pert, Cpm and Cost Analysis, Discovery Publishing House, 2006.

Kristowski A., The statistical tools and the investigation of relationships between the cause and the result in projecting of building works, Logistyka, Vol. 6, 2010, 1617- 1622.

Information

Information: Technical Transactions, 2014, Civil Engineering Issue 2-B (6) 2014, pp. 185-192

Article type: Original article

Titles:

Polish:

Modelling of network schedule including priority of selected technical resources

English:

Modelling of network schedule including priority of selected technical resources

Authors

Department of Metal Structures and Management in CE, Faculty of Civil and Environmental Engineering, Gdansk University of Technology

Published at: 16.06.2014

Article status: Open

Licence: None

Percentage share of authors:

Anna Jakubczyk-Gałczyńska (Author) - 100%

Article corrections:

-

Publication languages:

English

Modelling of network schedule including priority of selected technical resources

cytuj

pobierz pliki

RIS BIB ENDNOTE