Methodology of large project accomplishment based on nuclear power plants construction

Publication date: 16.06.2014

Technical Transactions, 2014, Civil Engineering Issue 2-B (6) 2014, pp. 127-135

https://doi.org/10.4467/2353737XCT.14.120.2570

Authors

Krzysztof Tracz
Faculty of Civil and Environmental Engineering and Architecture, University of Technology and Life Sciences in Bydgoszcz
All publications →

Download full text

Titles

Methodology of large project accomplishment based on nuclear power plants construction

Abstract

The paper looks at the systematic approach to management throughout the entire project life cycle. Some significant activities within particular phases of the overall process have been described in order to point out the fundamentals for a successful project. Planning assumptions, predicted risks and resources are always the basic parameters necessary for the optimal establishment of projec objectives. Further stages of projects need to be driven through those objectives while all contemporary constraints in the execution of the project have to be overcome by project team. The monitoring of progress and costs will always be critical for each contractor, however it becomes a real challenge when project requires the demanding quality and safety arrangements, as is the case when constructing nuclear power plants. The highest standards and procedures recommended for project management have been established in the UK and the USA. The main conclusions concerning the most important stages of project have been supported by examples of construction processes experienced by author in those countries.

References

Kasprowicz T., Proces of conceptual analysis designing, organization and implementation of construction projects, Technical Transactions 1-B/2010.

British standard BS 6079-1:2010.

The chartered institute of Building, Code of practice for project management for construction and development, John Wiley & Sons, 2010.

Kerzner H., Project Management, John Wiley & Sons, 2004.

Burke R., Project Management, Planning and Control, Burke publishing, 2006.

Murdoch J., Hughes W., Construction Contracts, Law and Management, Taylor & Francis, 2008.

A guide to the project management body of knowledge, Project Management Institute, 2008.

Tracz K., Budowa elektrowni jądrowych w Europie cz. I, II i III, Inżynier Budownictwa, 2013.

International standard ISO 10005: 2005, Quality management systems – Guidelines for quality plans.

International standard ISO 10006: 2005, Quality management systems – Guidelines for quality management in projects.

Information

Information: Technical Transactions, 2014, Civil Engineering Issue 2-B (6) 2014, pp. 127-135

Article type: Original article

Titles:

Polish:

Methodology of large project accomplishment based on nuclear power plants construction

English:

Methodology of large project accomplishment based on nuclear power plants construction

Authors

Faculty of Civil and Environmental Engineering and Architecture, University of Technology and Life Sciences in Bydgoszcz

Published at: 16.06.2014

Article status: Open

Licence: None

Percentage share of authors:

Krzysztof Tracz (Author) - 100%

Article corrections:

-

Publication languages:

English

Methodology of large project accomplishment based on nuclear power plants construction