EV with duration forecasting. Case study

Publication date: 16.06.2014

Technical Transactions, 2014, Civil Engineering Issue 2-B (6) 2014, pp. 299-307

https://doi.org/10.4467/2353737XCT.14.140.2590

Authors

Aneta Ziółkowska
Technology and Engineering Management Division, Faculty of Civil and Environmental Engineering, Warsaw University of Life Sciences
All publications →

Download full text

Titles

EV with duration forecasting. Case study

Abstract

This paper presents development of the earned value concept regarding forecasting project duration time. On the basis of the calculations carried out for an implemented investment project, consisting of development of the sanitary sewage and municipal water supply system, individual methods and their assumptions were presented and discussed.

PRZYKŁAD ZASTOSOWANIA EV WRAZ Z PROGNOZĄ TERMINU KOŃCOWEGO

W artykule przedstawione zostało rozwinięcie wartości wypracowanej w aspekcie prognozowania terminu końcowego realizacji. Na podstawie obliczeń przeprowadzonych dla zrealizowanej inwestycji obejmującej swoim zakresem rozbudowę kanalizacji sanitarnej i wodociągu wiejskiego przedstawione i omówione  zostały poszczególne metody i ich założenia.

References

[1] American National Standards Institute, Earned Value Management Systems, ANSI/EIA-748-A-1998, 1998.

[2] Anbari F., Earned value method and extensions, Project Manage J, 34 (4), 2003, 12-2.3.

[3] Athey K., EVM – Current Solution and Roadmap to Adoption, QuantumPM, 2007.

[4] Czarnigowska A., Earned value method as a tool for project control, Budownictwo i Architektura, 3, 2008, 15-32.

[5] Department of Energy, EVM TUTORIALS, USA, 2003 (http://energy.gov/management/office-management/operational-management/project-management/earned-value-management).

[6] Fleming Q., Koppelman J., Earned value project management, Newtowns Square. PA: PMI, 2000.

[7] Hernández JIM., Olaso JRO., Gómez JR.; Technical Performance Based Earned Value as a Management Tool for Engineering Projects, Chapter 7, 2013, (http://dx.doi.org/10.5772/54497).

[8] Jacob D., Forecasting project schedule completion with earned value.

9] Metrics, The Measurable News March:1, 2003, 7-9.

[10] Moslemi L., Shadrokh S., Salehipour A., A fuzzy approach for the earned value management, International Journal of Project Management, 29 (6), 2011, 764-772.

[11] Lipke W., Schedule is different, The Measurable News 2003 (March), 31-4.

[12] Połoński M., Prognozowanie czasu zakończenia inwestycji na podstawie jej bieżącego zaawansowania., Metody ilościowe w badaniach ekonomicznych Tom XIII/3, 2012, 169-179.

[13] Project Management Institute, A guide to the Project management Body of Knowledge (PMBOK Guide) – fourth edition, 2008, 181-186.

[14] Sagar K., Bhosekar, Gayatri Vyas, Cost controlling using Earned Value Analysis in construction Industries, International Journal if Engineering and Innovative Technology (IJEIT), Vol. 1, Issue 4, April 2012.

[15] Vandevoorde S., Vanhoucke M., Earned Value Forecast Accuracy and Activity Criticality, Measurable News, Issue 3, The Summer 2008.

[16] Vandevoorde S., Vanhoucke M., A comparison of different project duration forecasting methods using earned value metrics, International Journal of Project Management 24, 2006, 289-302.

[17] Vandevoorde S., Vanhoucke M., Measuring the Accuracy of Earned Value/Earned Schedule Forecasting Predistors, The Measurable News, Winter 2007–2008.

[18] Vandevoorde S., Vanhoucke M., Earned Value Forecast Accuracy and Activity Criticality, Measurable News, Issue 3, Summer 2008.

[19] Vandevoorde S., Vanhoucke M., Forecasting a Project’s Duration under Various Topological Structures, Measurable News, Issue 1, The Spring 2009.

[20] Webb A., Integrated cost and schedule control – a survey of UK experience, The engineering Journal, t. 5, No. 3, June 1995.

[21] OR-AS, Protrack (http://www.or-as.be/).

Information

Information: Technical Transactions, 2014, Civil Engineering Issue 2-B (6) 2014, pp. 299-307

Article type: Original article

Titles:

Polish:

EV with duration forecasting. Case study

English:

EV with duration forecasting. Case study

Authors

Technology and Engineering Management Division, Faculty of Civil and Environmental Engineering, Warsaw University of Life Sciences

Published at: 16.06.2014

Article status: Open

Licence: None

Percentage share of authors:

Aneta Ziółkowska (Author) - 100%

Article corrections:

-

Publication languages:

English

View count: 2363

Number of downloads: 1187

<p> EV with duration forecasting. Case study</p>

EV with duration forecasting. Case study

cytuj

pobierz pliki

RIS BIB ENDNOTE