FAQ

Drawings and realizations in the architecture
of Józef Pius Dziekoński

Publication date: 07.03.2016

Technical Transactions, 2015, Architecture Issue 9-A (15) 2015, pp. 135-140

Authors

Sebastian Kiesiewicz
Faculty of Architecture, Cracow University of Technology
All publications →

Download full text

Titles

Drawings and realizations in the architecture
of Józef Pius Dziekoński

Abstract

On the basis of Józef Pius Dziekoński’s projects: a house for the Industrial “Saturn” Society officials in Czeladź (1907), transformer building for the “Saturn” mine in Czeladź (1907), the administration building for the “Saturn” Society in Czeladż (1910), industrial architecture that is not just a package for technology, but creates a new aesthetic and functional qualities, is shown. Such architecture also provides added value to the technology. Analysis of the projects can lead to the conclusions that the work of architect can create the origins of new concepts, ideas and styles.

References


Information

Information: Technical Transactions, 2015, Architecture Issue 9-A (15) 2015, pp. 135-140

Article type: Original article

Titles:

Polish:

Drawings and realizations in the architecture
of Józef Pius Dziekoński

English:

Drawings and realizations in the architecture
of Józef Pius Dziekoński

Authors

Faculty of Architecture, Cracow University of Technology

Published at: 07.03.2016

Article status: Open

Licence: CC BY  licence icon

Percentage share of authors:

Sebastian Kiesiewicz (Author) - 100%

Article corrections:

-

Publication languages:

English

View count: 1480

Number of downloads: 921

Drawings and realizations in the architecture
of Józef Pius Dziekoński

cytuj

pobierz pliki

RIS BIB ENDNOTE