A concept of an integrated construction planning system involving location-based scheduling technique
Choose format
RIS BIB ENDNOTEA concept of an integrated construction planning system involving location-based scheduling technique
Publication date: 16.06.2014
Technical Transactions, 2014, Civil Engineering Issue 2-B (6) 2014, pp. 209-216
https://doi.org/10.4467/2353737XCT.14.129.2579Authors
A concept of an integrated construction planning system involving location-based scheduling technique
This paper concerns an integrated construction planning method which combines both BIM and location-based management and scheduling techniques. The methodology of 5D planning and LB(M)S is explained using appropriate examples. Location-based scheduling and management is an entirely new production system for construction. It uses locations as the container of project data as well as flow-line scheduling. The author believes it can be a powerful tool for schedule optimization, but still needs investigation regarding the scope of quantity takeoff methods and further improvements of a self-learning labor-demand data base.
Marcinkowski R., Krawczyńska A., Koncepcja metody analizy efektywności wykorzystania deskowań systemowych w budowie obiektu żelbetowego, Zeszyty Naukowe Politechniki Rzeszowskiej, Vol. 58, No. 3/2011/III, 2011, 257-264.
Krawczyńska A., Wybór systemu i planowanie organizacji wykorzystania deskowań systemowych w wykonawstwie konstrukcji betonowych, Problemy naukowo-badawcze budownictwa, Płockie Forum Budowlane, Płock 2010, 203-214.
Andersson N., Christensen K., Practical implications of location-based scheduling, Proc. CME25: Construction Management and Economics: past, present and future, University of Reading, Taylor and Francis Group, London 2007.
Kenley R., Seppänen O., Location based management for Construction – Planning, Scheduling and Control, Spon Press, London–New York, 2010.
Chen S-M. et al, A framework for an automated and integrated project scheduling and management system, Automation in Construction, Vol. 35, 2013, 89-110.
Song S. et al., Development of a BIM-based structural framework optimization and simulation system for building construction, Computers in Industry, Vol. 63, 2012, 895-912.
Monteiro A., Martins J., A survey on modeling guidelines for quantity takeoff-oriented BIM-based design, Automation in Construction, Vol. 35, 2013, 238-253.
Jongelin R., Ojoffson T., A method for planning of work-flow by combined use of location-based scheduling and 4D CAD, Automation in Construction, Vol. 16, 2007, 189-198.
Information: Technical Transactions, 2014, Civil Engineering Issue 2-B (6) 2014, pp. 209-216
Article type: Original article
Titles:
A concept of an integrated construction planning system involving location-based scheduling technique
A concept of an integrated construction planning system involving location-based scheduling technique
Faculty of Civil Engineering, Mechanics and Petrochemistry, Warsaw University of Technology
Published at: 16.06.2014
Article status: Open
Licence: None
Percentage share of authors:
Article corrections:
-Publication languages:
EnglishView count: 2745
Number of downloads: 2254