FAQ

A concept of an integrated construction planning system involving location-based scheduling technique

Publication date: 16.06.2014

Technical Transactions, 2014, Civil Engineering Issue 2-B (6) 2014, pp. 209-216

https://doi.org/10.4467/2353737XCT.14.129.2579

Authors

Anna Krawczyńska-Piechna
Faculty of Civil Engineering, Mechanics and Petrochemistry, Warsaw University of Technology
All publications →

Download full text

Titles

A concept of an integrated construction planning system involving location-based scheduling technique

Abstract

This paper concerns an integrated construction planning method which combines both BIM and location-based management and scheduling techniques. The methodology of 5D planning and LB(M)S is explained using appropriate examples. Location-based scheduling and management is an entirely new production system for construction. It uses locations as the container of project data as well as flow-line scheduling. The author believes it can be a powerful tool for schedule optimization, but still needs investigation regarding the scope of quantity takeoff methods and further improvements of a self-learning labor-demand data base.

References

Marcinkowski R., Krawczyńska A., Koncepcja metody analizy efektywności wykorzystania deskowań systemowych w budowie obiektu żelbetowego, Zeszyty Naukowe Politechniki Rzeszowskiej, Vol. 58, No. 3/2011/III, 2011, 257-264.

Krawczyńska A., Wybór systemu i planowanie organizacji wykorzystania deskowań systemowych w wykonawstwie konstrukcji betonowych, Problemy naukowo-badawcze budownictwa, Płockie Forum Budowlane, Płock 2010, 203-214.

Andersson N., Christensen K., Practical implications of location-based scheduling, Proc. CME25: Construction Management and Economics: past, present and future, University of Reading, Taylor and Francis Group, London 2007.

Kenley R., Seppänen O., Location based management for Construction – Planning, Scheduling and Control, Spon Press, London–New York, 2010.

Chen S-M. et al, A framework for an automated and integrated project scheduling and management system, Automation in Construction, Vol. 35, 2013, 89-110.

Song S. et al., Development of a BIM-based structural framework optimization and simulation system for building construction, Computers in Industry, Vol. 63, 2012, 895-912.

Monteiro A., Martins J., A survey on modeling guidelines for quantity takeoff-oriented BIM-based design, Automation in Construction, Vol. 35, 2013, 238-253.

Jongelin R., Ojoffson T., A method for planning of work-flow by combined use of location-based scheduling and 4D CAD, Automation in Construction, Vol. 16, 2007, 189-198.

Information

Information: Technical Transactions, 2014, Civil Engineering Issue 2-B (6) 2014, pp. 209-216

Article type: Original article

Titles:

Polish:

A concept of an integrated construction planning system involving location-based scheduling technique

English:

A concept of an integrated construction planning system involving location-based scheduling technique

Authors

Faculty of Civil Engineering, Mechanics and Petrochemistry, Warsaw University of Technology

Published at: 16.06.2014

Article status: Open

Licence: None

Percentage share of authors:

Anna Krawczyńska-Piechna (Author) - 100%

Article corrections:

-

Publication languages:

English

A concept of an integrated construction planning system involving location-based scheduling technique

cytuj

pobierz pliki

RIS BIB ENDNOTE