Dariusz Skorupka
Technical Transactions, Volume 6 Year 2017 (114), 2017, pp. 163-170
https://doi.org/10.4467/2353737XCT.17.096.6572The paper summarizes the concept of using unmanned aerial systems for construction work monitoring. Mobile drones can be used for determining the current stage of a given subtask in a complex construction project. Such control allows more adequate determination of the completion time of a given task, leading to more effective project schedule management.
Dariusz Skorupka
Technical Transactions, Civil Engeneering Issuet 1-B (5) 2014, 2014, pp. 203-209
https://doi.org/10.4467/2353737XCT.14.098.2548The paper contains a specification of the notions of risk, transport infrastructure and crisis situation. The study also presents selected methods of identification of risks to transport infrastructure facilities, based on the example of a bridge facility.
Dariusz Skorupka
Technical Transactions, Volume 9 Year 2017 (114), 2017, pp. 117-125
https://doi.org/10.4467/2353737XCT.17.152.7164Modern technologies, which may include unmanned aerial vehicles (UAV, Polish abbreviation BSL), potentially have a very wide range of applications. Research has been conducted on the possibility of using UAVs to control the execution of construction works by the authors of the article among other researchers. The technical parameters of the applied measurement instruments are of great significance. This paper presents a possibility for the optimal choice of unmanned aerial vehicles using the AHP method. The popularity of this method results not only from its effectiveness in solving complex decision problems, but also from its transparency and ease of application. The decision-making analysis adopts the criteria that are essential with regard to the supervision of construction works which they may support.
Dariusz Skorupka
International Journal of Contemporary Management, Issue 12(2), 2013, pp. 9-16
The article is related to risk management in construction undertakings. The authors discuss the nature of construction undertakings and legal aspects of these types of projects. The article presents an example of risk quantification which may occur during construction projects. The presented method of risk assessment is the authors’ original solution.