Anna Krawczyńska-Piechna
Czasopismo Techniczne, Budownictwo Zeszyt 2-B (6) 2014, 2014, s. 209-216
https://doi.org/10.4467/2353737XCT.14.129.2579This paper concerns an integrated construction planning method which combines both BIM and location-based management and scheduling techniques. The methodology of 5D planning and LB(M)S is explained using appropriate examples. Location-based scheduling and management is an entirely new production system for construction. It uses locations as the container of project data as well as flow-line scheduling. The author believes it can be a powerful tool for schedule optimization, but still needs investigation regarding the scope of quantity takeoff methods and further improvements of a self-learning labor-demand data base.