<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.3 20210610//EN" "JATS-journalpublishing1-3.dtd">
<article article-type="research-article" dtd-version="1.3" xml:lang="en"
    xmlns:mml="http://www.w3.org/1998/Math/MathML"
    xmlns:xlink="http://www.w3.org/1999/xlink"
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
    <processing-meta tagset-family="jats" base-tagset="publishing" mathml-version="2.0" table-model="xhtml"/>
    <front>
                        
                        <journal-meta>
            <issn>0011-4561</issn>
                                </journal-meta>
        <article-meta>
            <title-group>
                                    <article-title>Research on working time in the construction sector</article-title>
                                    <article-title>Research on working time in the construction sector</article-title>
                            </title-group>

                        <contrib-group>
                                                            <contrib contrib-type="author" corresp="no">
                            <name>
                                <surname>Malara</surname>
                                <given-names>Jarosław</given-names>
                            </name>
                            <role>author</role>
                                                                                                                                    <xref ref-type="aff" rid="aff-1"/>
                                                                                        <xref ref-type="corresp" rid="cor-1"/>
                        </contrib>
                                                </contrib-group>

                                                                                        <aff id="aff-1">
                    <institution-wrap>
                        <institution>Institute Of Building And Transport Management, Faculty Of Civil Engineering, Cracow University Of Techn</institution>
                                            </institution-wrap>
                </aff>
                            
            <author-notes>
                                    <corresp id="cor-1">Correspondence to: Jarosław Malara <email></email></corresp>
                            </author-notes>

                            <pub-date date-type="pub" publication-format="electronic" iso-8601-date="2015-02-11">
                    <day>11</day>
                    <month>02</month>
                    <year>2015</year>
                </pub-date>
            
            <volume>Budownictwo Zeszyt 5-B (19) 2014 </volume>
            <issue>2014</issue>
                        <fpage>169</fpage>
                                    <lpage>175</lpage>
            
            <permissions>
                <copyright-statement>Copyright &#x00A9; 2015</copyright-statement>
                                    <copyright-year>2015</copyright-year>
                            </permissions>

            <funding-group specific-use="Crossref">
                <funding-statement></funding-statement>
            </funding-group>
        </article-meta>
    </front>
    <body>
        &lt;p style=&quot;text-align: justify;&quot;&gt;
	The article describes the nature and the significance of research on working time of workers in the construction sector for the improvement of technology and organization of works. The author refers to the basic research methods and discusses the factors contributing to the performance of various works in the construction sector. Then, the research done on one of the construction sites in Warsaw, consisting of terrazzo tiling in stairways is discussed and the possible ways of interpreting the collected results is specified. The summary describes the benefits of proper observation and interpretation of research regarding working time of construction workers.&lt;/p&gt;

    </body>
    <back>
            </back>
</article>
