<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.3 20210610//EN" "JATS-journalpublishing1-3.dtd">
<article article-type="research-article" dtd-version="1.3" xml:lang="en"
    xmlns:mml="http://www.w3.org/1998/Math/MathML"
    xmlns:xlink="http://www.w3.org/1999/xlink"
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
    <processing-meta tagset-family="jats" base-tagset="publishing" mathml-version="2.0" table-model="xhtml"/>
    <front>
                        
                        <journal-meta>
            <issn>2449-8920</issn>
                                        <publisher>
                    <publisher-name>Wydział Zarządzania i Komunikacji Społecznej</publisher-name>
                </publisher>
                    </journal-meta>
        <article-meta>
            <title-group>
                                    <article-title>Building Information Modelling: an Innovative Way to Manage Risk in Construction Projects</article-title>
                                    <article-title>Building information modelling – innowacyjne zarządzanie ryzykiem w przedsięwzięciach budowlanych</article-title>
                            </title-group>

                        <contrib-group>
                                                            <contrib contrib-type="author" corresp="yes">
                            <name>
                                <surname>Araszkiewicz</surname>
                                <given-names>Krystyna</given-names>
                            </name>
                            <role>author</role>
                                                                                                                                    <xref ref-type="aff" rid="aff-1"/>
                                                                                        <xref ref-type="corresp" rid="cor-1"/>
                        </contrib>
                                                </contrib-group>

                                                                                        <aff id="aff-1">
                    <institution-wrap>
                        <institution>Zespół Dydaktyczny Ekonomiki Organizacji i Zarządzania w Budownictwie Wydział Budownictwa i Architektury ZUT</institution>
                                            </institution-wrap>
                </aff>
                            
            <author-notes>
                                    <corresp id="cor-1">Correspondence to: Krystyna Araszkiewicz <email>Krystyna.Araszkiewicz@zut.edu.pl</email></corresp>
                            </author-notes>

                            <pub-date date-type="pub" publication-format="electronic" iso-8601-date="2015-11-30">
                    <day>30</day>
                    <month>11</month>
                    <year>2015</year>
                </pub-date>
            
            <volume>Numer 14(3)</volume>
            <issue>2015</issue>
                        <fpage>23</fpage>
                                    <lpage>40</lpage>
            
            <permissions>
                <copyright-statement>Copyright &#x00A9; 2015</copyright-statement>
                                    <copyright-year>2015</copyright-year>
                            </permissions>

            <funding-group specific-use="Crossref">
                <funding-statement></funding-statement>
            </funding-group>
        </article-meta>
    </front>
    <body>
        &lt;p id=&quot;cke_pastebin&quot;&gt;&lt;strong&gt;Background&lt;/strong&gt;. Building Information Modelling (BIM) has been recently one of the most common issues discussed in publications related to innovative changes in the management of construction projects. The concept of BIM integrates all the activities related to the design, construction and operation into the ICT model developed and implemented within a communication platform. From the point of view of the project management theory and construction practice, the area of interest is integrated risk and change management based on BIM. Negative consequences such as delays and financial losses that are detrimental especially to public projects conducted by investors raise a question of whether and how implementation of principles of BIM in project management can improve management activities associated with risk in construction projects. &lt;/p&gt;
&lt;p id=&quot;cke_pastebin&quot;&gt;&lt;strong&gt;Research aims&lt;/strong&gt;. This paper aims to gain insight into the current state of knowledge about risk and change management in construction projects in terms of BIM implementation, and to set the direction for further research as well as to determine further research objectives related to this issue.&lt;/p&gt;
&lt;p id=&quot;cke_pastebin&quot;&gt;&lt;strong&gt;Methodology&lt;/strong&gt;. The arguments presented in this paper are based on the analysis of reference literature. &lt;/p&gt;
&lt;p id=&quot;cke_pastebin&quot;&gt;&lt;strong&gt;Key findings&lt;/strong&gt;: Risk is an issue in the concept of BIM that still needs to be systematized. It is necessary to develop an optimal way to integrate procedures, methods and techniques of risk management with other management actions within BIM. Change is perceived as one of the major risk factors and therefore the inclusion of change management processes into this system also requires the establishment of standards and methodical approach within BIM. Further research in this area should include past experience in the implementation of BIM in construction projects, the presence of risk-related procedures in this process and conditions of effective integration of management actions. From a practical point of view, it is also necessary to explore the willingness of entrepreneurs and investors to implement BIM, understood as a platform for communication, risk and change management as well as an optimal method for a systematized implementation of this process.&lt;/p&gt;
    </body>
    <back>
                    <ref-list>
                                                                                <ref id="B1">
                            <label>1</label>
                            <article-title>HM Treasury, UK (2004). The Orange Book. Management of Risk – Principles and Concepts.</article-title>
                        </ref>
                                                                                                    <ref id="B2">
                            <label>2</label>
                            <article-title>Abanda, F.H., Kurul, E., Tah, J.H.M., &amp;amp; Cheung, F. (2013). Rethinking the Build Process for BIM Adoption, conference material. CIB World Building Congress Construction and Society, Australia, 5–9 May 2013.</article-title>
                        </ref>
                                                                                                    <ref id="B3">
                            <label>3</label>
                            <article-title>Abderisak, A., &amp;amp; Lindahl, G. (2015). Take a chance on me? Construction client’s perspectives on risk management. Procedia Economics and Finance, 21, 548–554.</article-title>
                        </ref>
                                                                                                    <ref id="B4">
                            <label>4</label>
                            <article-title>Abdou, A., Alzarooni, S., &amp;amp; Lewis, J. (2004). Modelling risk for construction cost estimating and forecasting: a review. In: F. Khosrowshahi (ed.), 20th Annual ARCOM Conference, 1–3 September 2004. Heriot Watt University, Association Of Researches In Construction Management, vol. 1, 141–152.</article-title>
                        </ref>
                                                                                                    <ref id="B5">
                            <label>5</label>
                            <article-title>Adamus, Ł. (2012). Modelowanie informacji o budynku (BIM) podstawy teoretyczne. Prace Instytutu Techniki Budowlanej, 4(164), 13–26.</article-title>
                        </ref>
                                                                                                    <ref id="B6">
                            <label>6</label>
                            <article-title>Akram, S. et al. (2012). Opóźnienia i zakłócenia w projektach budowlanych. Warszawa–Ankara–Ascot–Mondavio: Komisja Europejska, Leonardo da Vinci – Transfer Innowacji.</article-title>
                        </ref>
                                                                                                    <ref id="B7">
                            <label>7</label>
                            <article-title>Azhar, S. (2011). Building Information Modeling (BIM): Trends, benefits, risks and challenges for the AEC industry. ASCE Journal of Leadership and Management in Engineering, 11(3), 241–252.</article-title>
                        </ref>
                                                                                                    <ref id="B8">
                            <label>8</label>
                            <article-title>Azhar, S. et al. (2012). Building Information Modeling (BIM): now and beyond. Australasian Journal of Construction Economics and Building, 12 (4), 15–28.</article-title>
                        </ref>
                                                                                                    <ref id="B9">
                            <label>9</label>
                            <article-title>Azhar, S., Hein, M., &amp;amp; Sketo, B. (2012). Building Information Modeling (BIM): benefits, risks and challenges. Leadership and Management in Engineering, 11(3), 241–252.</article-title>
                        </ref>
                                                                                                    <ref id="B10">
                            <label>10</label>
                            <article-title>Chien, K.F., Wu, Z.H., &amp;amp; Huang, S.C. (2014). Identifying and assessing critical risk factors for BIM projects: Empirical study. Automation in Construction, 45, 1–15.</article-title>
                        </ref>
                                                                                                    <ref id="B11">
                            <label>11</label>
                            <article-title>Collins, Z., Sijie, K., Kyungki, K., &amp;amp; Teizer, J. (2014). Integration of safety risk factors in BIM for scaffolding construction. Computing in Civil and Building Engineering, 307–314, doi: http://dx.doi.org/10.1061/9780784413616.039.</article-title>
                        </ref>
                                                                                                    <ref id="B12">
                            <label>12</label>
                            <article-title>Drzewiecka, J., &amp;amp; Pasławski, J. (2011). Analiza zakłóceń procesów budowlanych. Civil and Environmental Engineering, 2, 475–479.</article-title>
                        </ref>
                                                                                                    <ref id="B13">
                            <label>13</label>
                            <article-title>Eadie, R., Browne, M., Odeyinka, H., McKeown, C., &amp;amp; McNiff, S. (2015). A survey of current status of and perceived changes required for BIM adoption in the UK. Built Environment Project and Asset Management, 5(1), 4–21.</article-title>
                        </ref>
                                                                                                    <ref id="B14">
                            <label>14</label>
                            <article-title>Eastman, C., Teicholz, P. Sacks, R., &amp;amp; Liston, K. (2011). BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors”, 2nd ed. New York: John Wiley and Sons.</article-title>
                        </ref>
                                                                                                    <ref id="B15">
                            <label>15</label>
                            <article-title>Elmualim, A., &amp;amp; Gilder, J. (2013). BIM: innovation in design management, influence and challenges of implementation. Architectural Engineering and Design Management, 1–17, doi: 10.1080/17452007.2013.821399.</article-title>
                        </ref>
                                                                                                    <ref id="B16">
                            <label>16</label>
                            <article-title>Esmaeili, B., &amp;amp; Hallowell, M. (2012). Attribute-based Risk Model for Measuring Safety Risk of Struck-by Accidents. Construction Research Congress, 289–298.</article-title>
                        </ref>
                                                                                                    <ref id="B17">
                            <label>17</label>
                            <article-title>Fischer, M., &amp;amp; Hartmann, T. (2008). Applications of BIM and Hurdles for Widespread Adoption of BIM. AISC – ACCL eConstruction Roundtable Event Report, Stanford University CIFE.</article-title>
                        </ref>
                                                                                                    <ref id="B18">
                            <label>18</label>
                            <article-title>Flanagan, R., &amp;amp; Norman, G. (1993). Risk Management and Construction. London: Blackwell Science Ltd.</article-title>
                        </ref>
                                                                                                    <ref id="B19">
                            <label>19</label>
                            <article-title>Folga, J., Redliński, T., &amp;amp; Słobosz, J. (2014). Czego potrzeba, aby wprowadzić w firmie zarządzanie ryzykiem. In: Zarządzanie ryzykiem. Raport specjalny. Warszawa: Stowarzyszenie Polrisk.</article-title>
                        </ref>
                                                                                                    <ref id="B20">
                            <label>20</label>
                            <article-title>Giel, B., &amp;amp; Issa, R. (2013). Return on investment analysis of using Building Information Modeling in Construction. Journal Computer-Aided Civil and Infrastructure Engineering, 27(5), 511–521.</article-title>
                        </ref>
                                                                                                    <ref id="B21">
                            <label>21</label>
                            <article-title>Gordon, L.A., Loeb, M.P., &amp;amp; Tseng, Ch.Y. (2009). Enterprise risk management and firm performance: A contingency perspective. Journal of Accounting and Public Policy, 28, 301–327.</article-title>
                        </ref>
                                                                                                    <ref id="B22">
                            <label>22</label>
                            <article-title>Grzyl, B. (2011). Specyfika budowlanego przedsięwzięcia inwestycyjnego z perspektywy procesów logistycznych. Logistyka, 6.</article-title>
                        </ref>
                                                                                                    <ref id="B23">
                            <label>23</label>
                            <article-title>Harvey, R., Bahgat, T., Gerber, D., Kotronis, J., &amp;amp; Pysh, D. (2009). BIM as a Risk Management Platform enabling integrated practice and delivery. Journal of Building Information Modeling, the National Institute of Building Sciences, Fall, 14–17.</article-title>
                        </ref>
                                                                                                    <ref id="B24">
                            <label>24</label>
                            <article-title>Jobling, P., Merna, T., &amp;amp; Smith, N.J. (2006). Managing Risk in Construction Projects.Oxford, Blackwell Publishing Ltd.</article-title>
                        </ref>
                                                                                                    <ref id="B25">
                            <label>25</label>
                            <article-title>Kasprowicz, T. (2014). Inżynieria przedsięwzięć budowlanych. Warszawa: SGGW, http://sipb.sggw.pl/Dokumenty/Kasprowicz_IPB.pdf (access: 16.03.2015).</article-title>
                        </ref>
                                                                                                    <ref id="B26">
                            <label>26</label>
                            <article-title>Kiviniemi, A., Tarandi, V., Karlshøj, J., Bell, H., &amp;amp; Karud, O.J. (2008). Review of the De­­-</article-title>
                        </ref>
                                                                                                    <ref id="B27">
                            <label>27</label>
                            <article-title>velopment and Implementation of IFC Compatible BIM, https://www.tekes.fi/globalassets/global/ohjelmat-ja-palvelut/paattyneet-ohjelmat/yhdyskunta/erabuild_bim_final_report_january_2008.pdf (access: 14.03.2015)</article-title>
                        </ref>
                                                                                                    <ref id="B28">
                            <label>28</label>
                            <article-title>Kiviniemi, A., Sulankivi, K., Kähkönen, K., Mäkelä, T., &amp;amp; Merivirta, M. (2011). BIM Based Safety Management and Communication for Building Construction. Tampere: VTT Technical Research Centre of Finland.</article-title>
                        </ref>
                                                                                                    <ref id="B29">
                            <label>29</label>
                            <article-title>Khosrowshahi, F., &amp;amp; Arayici, Y. (2012). Roadmap for implementation of BIM in the UK construction industry. Engineering, Construction and Architectural Management, 19(6), 610–635.</article-title>
                        </ref>
                                                                                                    <ref id="B30">
                            <label>30</label>
                            <article-title>Ku, K., &amp;amp; Taiebat, M. (2011). BIM experiences and expectations: The constructor’s Perspective. International Journal of Construction Education and Research, 7(3), 175–197.</article-title>
                        </ref>
                                                                                                    <ref id="B31">
                            <label>31</label>
                            <article-title>Lam, J. (2003). Enterprise Risk Management: From Incentives to Controls. Hoboken, New Jersey: John Wiley &amp;amp; Sons Inc.</article-title>
                        </ref>
                                                                                                    <ref id="B32">
                            <label>32</label>
                            <article-title>LeFevre, M. (2011). No BIM for You: The case for not doing BIM leverage points, reframing and key decision factors in BIM transformation. Journal of Building Information Modeling, National Institute of Building Sciences buildingSMART alliance, 14–17.</article-title>
                        </ref>
                                                                                                    <ref id="B33">
                            <label>33</label>
                            <article-title>Loosemore, M., &amp;amp; McCarthy, C. (2008). Perceptions of contractual risk allocation in construction supply chains. Journal of Professional Issues in Engineering Education and Practice, 134(1), 95–105.</article-title>
                        </ref>
                                                                                                    <ref id="B34">
                            <label>34</label>
                            <article-title>Matějka, P., &amp;amp; Tomek, A. (2014). The impact of BIM on risk management as an argument for its implementation in a construction company. Procedia Engineering, 85, 501–509.</article-title>
                        </ref>
                                                                                                    <ref id="B35">
                            <label>35</label>
                            <article-title>Mills, A. (2001). A systematic approach to risk management for construction. Structural Survey, 19(5), 245–252.</article-title>
                        </ref>
                                                                                                    <ref id="B36">
                            <label>36</label>
                            <article-title>Mitchell, J. (2011). BIM &amp;amp; building simulation. In: Proceedings of Building Simulation 2011: 12th Conference of the International Building Performance Simulation Association, K1–K7.</article-title>
                        </ref>
                                                                                                    <ref id="B37">
                            <label>37</label>
                            <article-title>Oakley, P. (2008). CAD enough?. CAD User AEC Magazine, 21(1).</article-title>
                        </ref>
                                                                                                    <ref id="B38">
                            <label>38</label>
                            <article-title>Patrick, C.S., &amp;amp; Issa, R.R.A. (2007). Evaluating the impact of building information modeling (BIM) on construction. In: Proceedings of the 7th International Conference on Construction Applications of Virtual Reality, 206–215.</article-title>
                        </ref>
                                                                                                    <ref id="B39">
                            <label>39</label>
                            <article-title>Pishdad, P., &amp;amp; Beliveau, Y. (2010). Integrating multi-party contracting risk management (MPCRM) model with building information modeling (BIM). In: CIB W78 27th International Conference on Applications of IT in the AEC Industry, November, 2010, 16–19.</article-title>
                        </ref>
                                                                                                    <ref id="B40">
                            <label>40</label>
                            <article-title>Rudnicki, R., &amp;amp; Słobosz, J. (2014). Zintegrowane zarządzanie ryzykiem – luksus czy konieczność. In: Zarządzanie ryzykiem. Raport specjalny. Warszawa: Stowarzyszenie Polrisk.</article-title>
                        </ref>
                                                                                                    <ref id="B41">
                            <label>41</label>
                            <article-title>Schatz, K., &amp;amp; Rüppel, U. (2014). Visualization of a Fire Risk Index Method with Combined Deferred Maintenance Cost Estimation within a BIM environment. In: Proceedings of the 2014 International Conference on Computing in Civil and Building Engineering, Orlando, Florida, June 23–25, 2014, 267–274.</article-title>
                        </ref>
                                                                                                    <ref id="B42">
                            <label>42</label>
                            <article-title>Singh, V., Gu, N., &amp;amp; Wang, X. (2011). A theoretical framework of a BIM-based multi-disciplinary collaboration platform. Automation in Construction, 20, 134–144.</article-title>
                        </ref>
                                                                                                    <ref id="B43">
                            <label>43</label>
                            <article-title>Smith, P. (2014). BIM implementation – global strategies. Procedia Engineering, 85, 482–492.</article-title>
                        </ref>
                                                                                                    <ref id="B44">
                            <label>44</label>
                            <article-title>Succar, B. (2009). Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in Construction, 18, 357–375.</article-title>
                        </ref>
                                                                                                    <ref id="B45">
                            <label>45</label>
                            <article-title>Tah, J., &amp;amp; Carr, V. (2001). Knowledge-based approach to construction project risk management. Journal of Computing in Civil Engineering, 15(3), 170–177.</article-title>
                        </ref>
                                                                                                    <ref id="B46">
                            <label>46</label>
                            <article-title>Taroun, A. (2014). Towards a better modelling and assessment of construction risk: Insights from a literature review. International Journal of Project Management, 32, 101–115.</article-title>
                        </ref>
                                                                                                    <ref id="B47">
                            <label>47</label>
                            <article-title>Teixeira, J.C., Kulejewski, J., Krzemiński, M., &amp;amp; Zawistowski, J. (2011). Zarządzanie ryzykiem w budownictwie, Biblioteka Menadżerów Budownictwa. Warszawa: Guimaraes.</article-title>
                        </ref>
                                                                                                    <ref id="B48">
                            <label>48</label>
                            <article-title>Tomanek, M., &amp;amp; Juricek, J. (2015). Project risk management model based on PRINCE2 and SCRUM frameworks. International Journal of Software Engineering &amp;amp; Applications (IJSEA), 6(1), January, 81–88.</article-title>
                        </ref>
                                                                                                    <ref id="B49">
                            <label>49</label>
                            <article-title>Volk, R., Stengel, J., &amp;amp; Schultmann, F. (2014). Building Information Modeling (BIM) for existing buildings – literature review and future needs. Automation in Construction, 38, 109–127.</article-title>
                        </ref>
                                                                                                    <ref id="B50">
                            <label>50</label>
                            <article-title>Wong, A.K.D., Wong, F.K.W., &amp;amp; Nadeem, F.K.W. (2010). Attributes of building information modelling implementations in various countries. Architectural Engineering and Design Management, 6(4), 288–302.</article-title>
                        </ref>
                                                                                                    <ref id="B51">
                            <label>51</label>
                            <article-title>Wu, H., Sun, C., &amp;amp; Li, T. (2014). Study on the Structure of a risk management framework based on BIM. ICCREM, 312–319.</article-title>
                        </ref>
                                                                                                    <ref id="B52">
                            <label>52</label>
                            <article-title>Yan, H., &amp;amp; Damian, P. (2008). Benefits and barriers of building information modelling. 12th International Conference on Computing in Civil and Building Engineering, Beijing.</article-title>
                        </ref>
                                                                                                    <ref id="B53">
                            <label>53</label>
                            <article-title>Zima, K. (2013). Integracja dokumentacji w procesie budowlanym z wykorzystaniem modelowania informacji o budynku. Budownictwo i Architektura, 12(1), 77–84.</article-title>
                        </ref>
                                                                                                    <ref id="B54">
                            <label>54</label>
                            <article-title>Zou, P.X.W., &amp;amp; Zhang, G. (2009). Managing risks in construction projects: life cycle and stakeholder perspectives. International Journal of Construction Management, 9(1), 61–77.</article-title>
                        </ref>
                                                </ref-list>
            </back>
</article>
