TY - JOUR TI - Influence, of time randomness execution of work, on lenght of the construction cycle AU - Więckowski, Andrzej TI - Influence, of time randomness execution of work, on lenght of the construction cycle AB - The objective of this paper is to analyse the time reserves in scheduling periods for conducting processes that ensure construction deadlines can be met. By using the probability account and numerical analyses methods, including ‘Monte Carlo’, execution cycles have been analysed, as well as summary stoppage times for executing teams and working areas. On the basis of calculations made using data from studies made during the construction office building in Krakow it was stated that in order to keep to the planned deadline, must be smaller periods of performance of works by individual brigades, an average of 0,103 times of rhythm. VL - 2017 IS - Volume 3 Year 2017 (114) PY - 2017 SN - 0011-4561 C1 - 2353-737X SP - 115 EP - 123 DO - 10.4467/2353737XCT.17.036.6347 UR - https://ejournals.eu/en/journal/czasopismo-techniczne/article/wplyw-losowosci-czasow-wykonywania-robot-na-dlugosc-cyklu-budowy KW - time reserves KW - random processes KW - construction cycle