Baumann, T., Dziadosz, A., Rejment, M., KapliƄski, O. (2014). Range of aplication and limitations of the earned value method in construction project estimation. Technical Transactions, 2014, 65-72. doi: https://doi.org/10.4467/2353737XCT.14.113.2563