TY - JOUR TI - Modelling the delivery and laying of concrete mix AU - Więckowski, Andrzej TI - Modelling the delivery and laying of concrete mix AB - The aim of this paper is to indicate solutions which fulfil the conditions for laying concrete mix before it starts setting. Using models M/M/N/-/N, for organization I for the so-called delivery directly after unloading, with automatic transfer of information using the RFID system, and M/M/1/FIFO/N/F, for organisation II with transportation units working in closed cycle. Of example, organisation I, with RFID system is more advisable as it is characterised by a shorter waiting time on construction sites; and longer at the concretemixing plant. At the same time, it increases the efficiency of working units compared with organisation II which has self-regulating transportation units running in closed cycle. VL - 2017 IS - Volume 9 Year 2017 (114) PY - 2017 SN - 0011-4561 C1 - 2353-737X SP - 127 EP - 135 DO - 10.4467/2353737XCT.17.153.7165 UR - https://ejournals.eu/en/journal/czasopismo-techniczne/article/modelling-the-delivery-and-laying-of-concrete-mix KW - queueing theory KW - construction KW - production organisation