Skorupka, D., Duchaczek, A., Waniewska, A. (2017). Optimisation of the choice of UAV intended to control the implementation of construction projects and works using the AHP method. Technical Transactions, 2017, 117-125. doi: https://doi.org/10.4467/2353737XCT.17.152.7164