TY - JOUR TI - Accounting for time-dependent effects in the construction stage FEM analysis of composite pre-stressed bridge girders AU - Gwoździewicz, Piotr AU - Jarno, Łukasz AU - Pamin, Jerzy TI - Accounting for time-dependent effects in the construction stage FEM analysis of composite pre-stressed bridge girders AB - In this paper, the results of the numerical analysis of pre-stressed concrete girders made of a high-strength concrete composite with a slab made of normal concrete are presented. A FEM analysis of the construction stage considering the influence of rheological effects on the behaviour of the structure was performed. Results of the analysis are presented in the work and are compared with the results of numerical analysis of the same elements, in which the time-dependent effects are not included. On the basis of these results, appropriate conclusions are proposed. VL - 2015 IS - Budownictwo Zeszyt 3-B (23) 2015 PY - 2016 SN - 0011-4561 C1 - 2353-737X SP - 77 EP - 88 DO - 10.4467/2353737XCT.15.164.4339 UR - https://ejournals.eu/czasopismo/czasopismo-techniczne/artykul/accounting-for-time-dependent-effects-in-the-construction-stage-fem-analysis-of-composite-pre-stressed-bridge-girders KW - construction stages KW - finite elements method KW - prestressed concrete KW - rheology