%0 Journal Article %T Use of the KASS program in scheduling %A Krzemiński, Michał %J Czasopismo Techniczne %V 2014 %R 10.4467/2353737XCT.14.130.2580 %N Budownictwo Zeszyt 2-B (6) 2014 %P 217-224 %K scheduling, construction scheduling, flow shop models %@ 0011-4561 %D 2014 %U https://ejournals.eu/czasopismo/czasopismo-techniczne/artykul/use-of-the-kass-program-in-scheduling %X This paper presents uses for the KASS (Krzeminski Algorithm Scheduling System) program in scheduling for construction projects. The program serves as a tool for scheduling for up to a maximum of 10 work crews at 13 work sites, and then applies a complete overhaul in simulation. This paper describes the first version of the program released in 2012, as well as the modified version introduced in 2013.