@article{b05afb27-1c23-42fa-9176-917d3680912f, author = {Maja Bartoszek, Michał Juszczyk}, title = {Selected problems of bim -based planning of construction works – case study}, journal = {Czasopismo Techniczne}, volume = {2015}, number = {Budownictwo Zeszyt 4-B (28) 2015}, year = {2016}, issn = {0011-4561}, pages = {153-163},keywords = {BIM; scheduling; construction planning; BIM based planning}, abstract = {The article presents the problem of planning works based on the BIM model of a building. The authors briefly discuss the possibility of using BIM as a tool for planning works, and then present the case study. In the case study method in a synthetic manner the planning process presents works based on a model residential building construction. The advantages and opportunities as well as the problems of using BIM as a basis for the planning process of construction works are discussed and commented in the conclusions.}, doi = {}, url = {https://ejournals.eu/czasopismo/czasopismo-techniczne/artykul/selected-problems-of-bim-based-planning-of-construction-works-case-study} }