TY - JOUR TI - Assignment problem and its extensions for construction project scheduling AU - Jaśkowski, Piotr AU - Tomczak, Michał TI - Assignment problem and its extensions for construction project scheduling AB - The assignment problem consists of allocating renewable resources (construction equipment, crews, or contractors) of limited availability to a set of activities. The classical model for this problem minimizes the total time or cost of completing all activities with the assumption that each activity is assigned to one particular resource. This paper systematizes and describes extensions of these assumptions, considering the effects of task sequence: parallel, serial and hybrid (modeled by means of network methods). This study proposes algorithms for the solution of presented models, which can be used in construction project scheduling. VL - 2014 IS - Budownictwo Zeszyt 2-B (6) 2014 PY - 2014 SN - 0011-4561 C1 - 2353-737X SP - 241 EP - 248 DO - 10.4467/2353737XCT.14.133.2583 UR - https://ejournals.eu/czasopismo/czasopismo-techniczne/artykul/assignment-problem-and-its-extensions-for-construction-project-scheduling KW - assignment problem KW - project scheduling KW - mathematical modeling KW - renewable resources KW - bottleneck assignment problem