%0 Journal Article %T Assignment problem and its extensions for construction project scheduling %A Jaśkowski, Piotr %A Tomczak, Michał %J Czasopismo Techniczne %V 2014 %R 10.4467/2353737XCT.14.133.2583 %N Budownictwo Zeszyt 2-B (6) 2014 %P 241-248 %K assignment problem, project scheduling, mathematical modeling, renewable resources, bottleneck assignment problem %@ 0011-4561 %D 2014 %U https://ejournals.eu/czasopismo/czasopismo-techniczne/artykul/assignment-problem-and-its-extensions-for-construction-project-scheduling %X The assignment problem consists of allocating renewable resources (construction equipment, crews, or contractors) of limited availability to a set of activities. The classical model for this problem minimizes the total time or cost of completing all activities with the assumption that each activity is assigned to one particular resource. This paper systematizes and describes extensions of these assumptions, considering the effects of task sequence: parallel, serial and hybrid (modeled by means of network methods). This study proposes algorithms for the solution of presented models, which can be used in construction project scheduling.