%0 Journal Article %T A concept of an integrated construction planning system involving location-based scheduling technique %A KrawczyƄska-Piechna, Anna %J Czasopismo Techniczne %V 2014 %R 10.4467/2353737XCT.14.129.2579 %N Budownictwo Zeszyt 2-B (6) 2014 %P 209-216 %K scheduling, location-based methods, multilevel planning %@ 0011-4561 %D 2014 %U https://ejournals.eu/czasopismo/czasopismo-techniczne/artykul/a-concept-of-an-integrated-construction-planning-system-involving-location-based-scheduling-technique %X This paper concerns an integrated construction planning method which combines both BIM and location-based management and scheduling techniques. The methodology of 5D planning and LB(M)S is explained using appropriate examples. Location-based scheduling and management is an entirely new production system for construction. It uses locations as the container of project data as well as flow-line scheduling. The author believes it can be a powerful tool for schedule optimization, but still needs investigation regarding the scope of quantity takeoff methods and further improvements of a self-learning labor-demand data base.