@article{16a89db7-fe50-444e-987b-c431100970d1, author = {Anna KrawczyƄska-Piechna}, title = {A concept of an integrated construction planning system involving location-based scheduling technique}, journal = {Czasopismo Techniczne}, volume = {2014}, number = {Budownictwo Zeszyt 2-B (6) 2014}, year = {2014}, issn = {0011-4561}, pages = {209-216},keywords = {scheduling; location-based methods; multilevel planning}, abstract = {This paper concerns an integrated construction planning method which combines both BIM and location-based management and scheduling techniques. The methodology of 5D planning and LB(M)S is explained using appropriate examples. Location-based scheduling and management is an entirely new production system for construction. It uses locations as the container of project data as well as flow-line scheduling. The author believes it can be a powerful tool for schedule optimization, but still needs investigation regarding the scope of quantity takeoff methods and further improvements of a self-learning labor-demand data base.}, doi = {10.4467/2353737XCT.14.129.2579}, url = {https://ejournals.eu/czasopismo/czasopismo-techniczne/artykul/a-concept-of-an-integrated-construction-planning-system-involving-location-based-scheduling-technique} }